Insights and News
Showing 180 results.
Blogs
18 Aug 2026
Calculate mooring chain weight, break load and proof load
Selecting the right mooring chain is a critical part of offshore mooring system design. Whether you're planning a temporary mooring spread, evaluating equipment requirements, or reviewing installation parameters, having quick access to accurate chain data can save valuable time.
Brochures
11 Aug 2026
Suction Pile track record
Our Suction Pile track record showcases Intermoor's extensive experience designing, fabricating and delivering suction piles for some of the world's most demanding offshore energy projects. With hundreds of suction piles fabricated and deployed across a wide range of applications, the brochure highlights our proven capability and project experience.
News
11 Aug 2026
Acteon announces the sale of Menck, its Marine Foundations business line, to Cadeler
Acteon today announced the sale of Menck, its Marine Foundations business line, to Cadeler. The transaction marks an important milestone in Acteon’s transformation and advances our strategy to build stronger, more focused businesses serving our offshore energy customers.
News
04 Aug 2026
Intermoor secures third Petrobras contract for mooring and subsea asset services in Brazil
Intermoor, Acteon’s Moorings and Anchors business line, has been awarded a new contract by Petrobras for the provision of inspection, preservation, maintenance, and operational readiness services for subsea interconnection, mooring and anchoring materials. This award marks the third contract secured by Intermoor from Petrobras in the past 18 months.
Case Studies
21 Jul 2026
Development and installation of towing systems on an FPSO in deep water
Intermoor, Acteon’s Moorings and Anchors business line, delivered the safe design, installation and commissioning of an emergency towing system and the towing system for FPSO Cidade de Niterói MV18 in 1,400 m water depth.
Brochures
16 Jul 2026
Drive-drill-drive (3D) method for monopiles
When ground conditions make driving alone difficult, offshore installation needs more than force, it needs the right method. Menck’s drive-drill-drive method, also known as 3D, combines pile driving and drilling to help monopiles reach target depth in challenging seabed conditions. Learn how Menck’s drive-drill-drive (3D) method supports monopile installation in hard, rocky or variable ground conditions.
Case Studies
14 Jul 2026
Reliable pile driving at Hollandse Kust West VI offshore wind farm
Menck, Acteon’s Marine Foundations business line, supplied a reliable pile driving and noise mitigation solution for 50 monopile installations at Ecowende’s offshore wind farm Hollandse Kust West VI in the Netherlands for Van Oord B.V.
Brochures
09 Jul 2026
Entering uncharted waters: The deepwater challenge
As offshore energy moves into deeper, harsher and more complex waters, uncertainty beneath the seabed is driving higher costs, delays and foundation risks. This report explains how new seabed‑based geotechnical drilling technologies are transforming deepwater site investigations, delivering faster, more accurate data, reducing downtime and enabling leaner, safer, more resilient offshore foundations. Download the report today!
Case Studies
03 Jul 2026
Integrated site characterisation supports floating offshore wind development in the North Sea
UTEC, Acteon’s Geo-services business line, delivered integrated geophysical, environmental and geotechnical surveys across Bellrock and Broadshore floating offshore wind sites in the North Sea, supporting early-stage site characterisation and development planning.
Blogs
25 Jun 2026
Why today’s offshore wind foundations demand more than power
Offshore wind is expanding faster than any other energy sector. The drive for larger turbine capacities and improved project economics is forcing offshore wind into deeper waters and harsher environments, demanding larger monopiles, greater penetration depths, and far more precise installation methods. At the same time, developers face rising cost pressures, tightening weather windows, supply bottlenecks, and increasingly strict environmental regulations, especially around underwater and airborne noise.
Case Studies
17 Jun 2026
Deepwater decommissioning campaign for Petrojarl I FPSO
Intermoor, Acteon’s Moorings and Anchors business line, executed a multi-phase offshore decommissioning campaign for Petrojarl I FPSO offshore Brazil. The first phase included the provision of engineering for pull-in wire replacement, risers pull-out, mooring line disconnection, including a contingency plan of non-operability of mooring winches and the FPSO towing preparation and tow plan.
Brochures
15 Jun 2026
Principles of long-term mooring integrity
From scheduled inspection campaigns to rapid incident response, mooring integrity teams work above and below the waterline to assess condition and act where it matters. By identifying issues like mooring chain wear and seabed trenching around the anchors early, they deliver targeted repairs and life extension strategies that minimise disruption and protect asset performance.