0% found this document useful (0 votes)
344 views5 pages

r2004 01 105

Hitachi has developed three sizes of standardized straddle-type monorail systems with carrying capacities ranging from 2,000 to 25,000 passengers per hour. It has also refined its driverless…

Uploaded by

ihce2004
0% found this document useful (0 votes)
344 views5 pages

r2004 01 105

Hitachi has developed three sizes of standardized straddle-type monorail systems with carrying capacities ranging from 2,000 to 25,000 passengers per hour. It has also refined its driverless train operation (DTO) system, which allows trains to operate without an on-board driver. The DTO system has now been demonstrated on a commercial monorail route in Japan.

0% found this document useful (0 votes)
344 views5 pages

r2004 01 105

Hitachi has developed three sizes of standardized straddle-type monorail systems with carrying capacities ranging from 2,000 to 25,000 passengers per hour. It has also refined its driverless…

Uploaded by

ihce2004
You are on page 1/ 5
You are on page 1
5
576648e32a3d8b82ca71961b7a986505