This article needs to be updated. (October 2025) |
Line 2 of the Changchun Rail Transit (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.
| Line 2 | |
|---|---|
Line 2 train departing from Jiefang Ave. Station | |
| Overview | |
| Status | Operational |
| Owner | Changchun |
| Locale | Changchun, Jilin, China |
| Termini | |
| Stations | 21 |
| Service | |
| Type | Rapid transit |
| System | Changchun Rail Transit |
| Services | 1 |
| Operator(s) | Changchun Rail Transit Corporation |
| History | |
| Opened | 30 August 2018 |
| Technical | |
| Line length | 24.9 km (15.47 mi)[2] |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
History
editPhase 1
editPhase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[3]
Western extension
editThe western extension to Qiche Gongyuan opened on 8 October 2021.[2] The extension is 4.36 km in length.[4]
Opening timeline
edit| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Shuangfeng — Dongfang Square | 30 August 2018 | 20.5 km (12.74 mi)[3] | 18 | Phase 1 |
| Shuangfeng — Qiche Gongyuan | 8 October 2021[2] | 4.36 km (2.71 mi)[4] | 3 | Western extension |
Service routes
editStations
edit| Station name | Connections | Distance km |
Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Qiche Gongyuan | 汽车公园 | Luyuan | |||||
| Jieda Avenue | 捷达大路 | ||||||
| West Lake | 西湖 | ||||||
| Shuangfeng | 双丰 | 6 | 2.18 | 2.18 | |||
| Changchun West Railway Station | 长春西站 | 6 CJ ~ JH Tram 55 CRT |
1.52 | 3.70 | |||
| Xinglongpu | 兴隆堡 | 2.09 | 5.79 | ||||
| West Ring Road | 西环城路 | 1.41 | 7.20 | ||||
| Heping Street | 和平大街 | 1.14 | 8.34 | ||||
| Wanfu Street | 万福街 | Tram 54 | 0.82 | 9.16 | |||
| Jingyang Square | 景阳广场 | 0.86 | 10.02 | ||||
| Jiefang Overpass | 解放桥 | 3 | 1.07 | 11.09 | Luyuan / Chaoyang | ||
| Jianshe Square | 建设广场 | 0.80 | 11.89 | Chaoyang | |||
| Wenhua Square | 文化广场 | 0.75 | 12.64 | ||||
| Jiefang Avenue | 解放大路 | 1 | 1.36 | 14.00 | Chaoyang / Nanguan | ||
| Pingyang Street | 平阳街 | 0.78 | 14.78 | Nanguan | |||
| Nanguan | 南关 | 1.12 | 15.90 | ||||
| Jilin Avenue | 吉林大路 | 4 | 1.31 | 17.21 | Erdao | ||
| Dongsheng Street | 东盛大街 | 0.99 | 18.20 | ||||
| East Ring Road | 东环城路 | 1.46 | 19.66 | ||||
| Changqing | 长青 | 1.27 | 20.93 | Erdao / Nanguan | |||
| Dongfang Square | 东方广场 | 1.38 | 22.31 | Erdao | |||
| Ha'erbin Dajie | 哈尔滨大街 | ||||||
| Doujiagou | 窦家沟 | ||||||
| Yingjun Dajie | 英俊大街 | ||||||
| Yingkai Dajie | 英凯大街 | ||||||
| Linxi Dajie | 林溪大街 | ||||||
| Wukaihe Dajie | 雾开河大街 | ||||||
Future Development
edit- Eastern extension
An eastern extension to Wukaihe Dajie Station is under construction. The extension is 10.607 km in length.[5] It's scheduled to open in 2025.
References
edit- ^ a b "长春地铁2号线东延线即将通车,内景曝光!".
- ^ a b c 10月8日8时 长春轨道交通2号线西延线将开通运营. 新浪吉林 (in Chinese). 2021-10-07. Archived from the original on 2021-10-07. Retrieved 2021-11-28.
2号线运营里程增长4.4公里,达到24.9公里
- ^ a b 长春地铁进入换乘时代 2号线8月30日通车. 新华网吉林 (in Chinese). 2018-08-30. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
- ^ a b 长春地铁2号线西延线预计今年年末开通. 中国新闻网 (in Chinese). 2021-04-07. Archived from the original on 2021-08-08. Retrieved 2021-08-08.
线路全长4.36km,共设车站3座,均为地下站
- ^ 长春地铁2号线东延工程项目正式开工. Sohu 搜狐 (in Chinese). 2019-11-27. Archived from the original on 2021-02-04. Retrieved 2019-11-27.