0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hainault Underground Station

General Information

Completion: 1948
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 51° 36' 11.88" N    0° 5' 35.88" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Excerpt from Wikipedia

Hainault is a London Underground station in Hainault, east London, England. The station is on the Central line between Fairlop and Grange Hill stations. Since 2 January 2007 the station is in Travelcard Zone 4. This station is also home to one of the three Central line depots.

History

The station was opened on 1 May 1903 as part of the Great Eastern Railway's (GER) Fairlop Loop branch line from Woodford to Ilford. The line was designed to stimulate suburban growth but was closed on 1 October 1908 due to a lack of custom and did not reopen until 2 March 1930. In 1923, GER was merged with other railway companies to form the London & North Eastern Railway (LNER) under the 1921 Railways Act. As part of the 1935–1940 "New Works Programme" of the London Passenger Transport Board, the majority of the loop was transferred to form the eastern extensions of the Central line. Although work on this commenced in 1938, it was suspended upon the outbreak of the Second World War in 1939 and work only recommenced in 1946.

Steam train services serving Hainault were suspended on 29 November 1947 and electrified Central line passenger services, to Central London via Gants Hill, finally commenced on 31 May 1948. The line from Newbury Park to Hainault had been electrified for empty train movements to the new depot at Hainault from 14 December 1947. The services to Woodford via Grange Hill were reintroduced on 21 November 1948.

Alterations at Hainault included a new island platform on the west side of the station to allow the bulk of services via Gants Hill to be terminated here as well as allowing access to Hainault Depot. This, situated to the north of the station, is the major train depot on the eastern end of the line. The depot building was completed in 1939 but was used by the US Army Transportation Corps until 1945. The depot was in use for Central line stock from 14 December 1947.

From the mid-1960s until the early 1990s the Woodford-Hainault section was largely operated separately from the rest of the Central line, using four-car (later three-car) trains of 1960 Stock. The three car units had a 1938 tube stock middle carriage. These trains were adapted for Automatic Train Operation (ATO): the Woodford-Hainault section became the testing ground for ATO on the Victoria line. Some Victoria line (1967 Stock) trains were also used to operate this section and named FACT, "Fully Automatic Controlled Train". The separate operation has now been abolished, the 1960 Stock withdrawn and through trains to Central London now operate, albeit via Hainault and the 1960 Stock (along with the rest of the Central line's 1962 Stock) has been superseded by trains of 1992 Stock.

Station Improvements

The station has recently been the focus of a refurbishment programme. The ticket office has been refurbished, a new Station Supervisor's Office in the ticket hall was completed in June 2009 and lifts have been installed to allow step-free access to the platforms. The lifts are the shallowest on the London Underground network, having a descent of just 0.67 metres.

Text imported from Wikipedia article "Hainault tube station" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20053862
  • Published on:
    22/02/2010
  • Last updated on:
    24/12/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine