File:5n PERT graph with critical path.svg

Size of this PNG preview of this SVG file: 405 × 188 pixels. Other resolutions: 320 × 149 pixels | 640 × 297 pixels | 1,024 × 475 pixels | 1,280 × 594 pixels | 2,560 × 1,188 pixels.
Original file (SVG file, nominally 405 × 188 pixels, file size: 4 KB)
File information
Structured data
Captions
Captions
Add a one-line explanation of what this file represents
Summary
editDescription5n PERT graph with critical path.svg | The graph was created with Graphviz from the graph specification below. |
Date | |
Source | Own work |
Author | hu:User:Illes |
Permission (Reusing this file) |
The image is in the public domain. |
digraph untitl { node [ fontname="Helvetica-Bold", shape="circle", width="0.3", style ="setlinewidth(2),filled" color="black", fillcolor = "pink", label=""]; edge [ fontname="Helvetica-Bold", fontsize="16", style="bold" ]; graph [ rankdir="LR", ranksep="0.4"]; { rank = same; B, D } A -> B [ label = "3", color="red"]; B -> C [ label = "2"]; B -> E [ label = "1", color="red"]; E -> C [ label = "3", color="red"]; A -> D [ label = "2"]; D -> C [ label = "3"]; }
Public domainPublic domainfalsefalse |
![]() |
This work is ineligible for copyright and therefore in the public domain because it consists entirely of information that is common property and contains no original authorship. |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 13:07, 13 January 2007 | ![]() | 405 × 188 (4 KB) | Illes (talk | contribs) | {{Information |Description=The graph was created with Graphviz from the graph specification below. |Source=own work |Date=January 12, 2007 |Author=hu:User:Illes |Permission=The image is in the public domain. }} <pre> digraph untitl { node [ fontname= |
You cannot overwrite this file.
File usage on Commons
The following 3 pages use this file:
File usage on other wikis
The following other wikis use this file:
- Usage on ar.wikipedia.org
- Usage on bg.wikipedia.org
- Usage on en.wikipedia.org
- Usage on gl.wikipedia.org
- Usage on hi.wikipedia.org
- Usage on sw.wikipedia.org
- Usage on www.wikidata.org
- Usage on zh.wikipedia.org