Subway Toronto

Subway Toronto inggih punika sistem angkut gelis sane ngayahin Toronto lan kota pisaga Vaughan ring Ontario, Kanada. Puniki kamargiang olih Komisi Transit Toronto (TTC), lembaga saking Kota Toronto. Sistem puniki wantah jaringan kereta api sané kawangun antuk limang jalur: Jalur 1 Yonge-University, Jalur 2 Bloor-Danforth, Jalur 4 Sheppard, Jalur 5 Eglinton, miwah Jalur 6 Finch Kauh.

  1. Pikobet nganggit: Tanda <ref> tidak sah; tidak ditemukan teks untuk ref bernama TTC-2013-Stats
  2. "Toronto-York Spadina Subway Extension". TTC.ca. Kaarsipin saking versi asli tanggal August 19, 2021. Kaaksés February 8, 2017.
  3. "Transit Ridership Report Third Quarter 2025" (PDF). American Public Transportation Association. November 20, 2025. Kaaksés December 1, 2025.
  4. "Transit Ridership Report Fourth Quarter 2024" (PDF). American Public Transportation Association. February 19, 2025. Kaaksés February 25, 2025.
  5. 1 2 Service Planning and Scheduling Department (February 8, 2026). "Service Summary: February 8 to March 14, 2026" (PDF). Toronto Transit Commission. Kaaksés February 8, 2026.
  6. "Eglinton Crosstown LRT". Metrolinx.com. Kaarsipin saking versi asli tanggal May 6, 2021. Kaaksés January 28, 2018.
  7. "Scarborough Subway Extension". Metrolinx. January 2023. Kaaksés January 28, 2023.
Subway Toronto
Subway Toronto
A Toronto Rocket subway train at Museum station
A Flexity Freedom light rail vehicle at Eglinton station
Overview
Druén
Genah layananGreater Toronto
Genah
Soroh transitRapid transit
Akéh jalur5 (plus 1 under construction)
Akéh stasiun109 (plus 26 under construction)[1][2]
Panumpang sarahina1.079.700 (weekdays, Q3 2025)[3]
Panumpang ngawarsa331.789.000 (2024)[4]
Operasi
Ngawit maoperasiMaret 30, 1954; sampun 72 warsa (1954-03-30)
OperatorToronto Transit Commission
Akéh kendaraan
  • 830 heavy rail cars
  • 66 work cars
Lantang kereta
  • 6 cars (Lines 1 and 2)
  • 4 cars (Line 4)
  • 2 cars (Line 5)
  • 1 car (Line 6)
Palajuan
  • 2 min 30 s – 5 min (Line 1)
  • 2 min 20 s – 6 min (Line 2)
  • 5 min 30 s (Line 4)
  • 4 min 4 s – 12 min 40 s (Line 5)
  • 6 min 32 s – 12 min 15 s (Line 6)[5]
Téknis
Lantang sistem100.1 km (62.2 mi)[5]
(33.2 km (20.6 mi) under construction)[6][7]
Pangukur lintasan
  • 1.495 mm (4 ft 10+78 in) lebar sepur Toronto (Lines 1, 2 and 4)
  • 1.435 mm (4 ft 8+12 in) sepur standar (Lines 5 and 6)
Elektrifikasi
System map
Peta

Mal:Toronto subway